Assessment on the main engineering geological problems in the south-north line of Nanjing metro(PDF)

《地球科学与环境学报》[ISSN:1672-6561/CN:61-1423/P]

Issue:
2004年第01期
Page:
46-51
Research Field:
Publishing date:

Info

Title:
Assessment on the main engineering geological problems in the south-north line of Nanjing metro
Author(s):
CHENG Jian-junYAN San-baoJIANG Jian-pingMA Ji
Department of Earth Sciences , Nanjing University , Nanjing 210093 , China
Keywords:
metro engineering geological problemsevaluation
PACS:
P642
DOI:
-
Abstract:
The paper presents the general situation as well as the engineering conditions of the first-period project of the North-South line of Nanjing metro .The topographty is complicated along the metro construction line .It has to cross bedrocks flood basin, the saturated silt and fine sand in ancient riverbeds .And engineering geological problems will be caused:regional stability , sand liquefaction , the stability of surrounding rockmass or soilmass , water inflow and seepage deformation, ground differential subsidences.Using preferred plane theory , these problems are discussed and the countermeasures are given.It has been proved by practices that it is vitally important for the reconnaissance and constructional plan to recognize the engineering geological problems clear and make scientific evaluations.

References:

[1] 南京大学地球科学系, 江苏地质工程勘察院, 南京市测绘勘察 研究院.工程地质勘察报告[R] .南京:南京大学地球科学系, 2002.
[2] 庄乾城, 罗国煜, 李晓昭.南京地铁稳定性优势面理论分析 [J] .高校地质学报,2002 , 84):453 ~ 459 .
[3] 罗国煜, 陈新民, 李晓昭, 等.城市环境岩土工程[M] .南京: 南京大学出版社,2000 .
[4] 罗国煜, 刘松玉.区域稳定性优势面分析理论与方法[J] .岩土 工程学报, 1992 , 146):10 ~ 18 .
[5] 佘才高.南京地铁南北线隧道地基的地震液化问题[J] .城市 轨道交通研究, 2001 , 33):38 ~ 42 .
[6] 李晓昭, 罗国煜, 汪青葆.玄武湖水下交通隧道环境地质条件 分析及工程方案评价[J] .工程地质学报, 1999, 72):118 ~ 124.
[7] 徐则民, 张倬元, 刘汉超, 等.成都地铁环境工程地质评价[J] . 中国地质灾害与防治学报, 2002 ,132):63~ 69 .
[8] 蒋建平, 章扬松, 罗国煜, 等.南京地铁地基下稳定性因素分析 及对策[J] .地下空间, 2002 ,221):42~ 44 .