Response Law of Surrounding Rock of Metro Tunnel Concealed Excavation Crossing Ground Fissure Zone—Taking Xi'an Metro Line 6 in Shaanxi, China as an Example(PDF)

《地球科学与环境学报》[ISSN:1672-6561/CN:61-1423/P]

Issue:
2025年第03期
Page:
356-370
Research Field:
黄河流域生态保护和高质量发展专刊(上)
Publishing date:

Info

Title:
Response Law of Surrounding Rock of Metro Tunnel Concealed Excavation Crossing Ground Fissure Zone—Taking Xi'an Metro Line 6 in Shaanxi, China as an Example
Author(s):
GUO Zhe-hao1 HUANG Qiang-bing123* GOU Yu-xuan1 GUO Zhi-yu1 LI Chen-yang4
(1.School of Geological Engineering and Geomatics,Chang'an University,Xi'an 710054,Shaanxi,China; 2.Key Laboratory of Earth Fissures Geological Disaster of Ministry of Natural Resources,Nanjing 210049,Jiangsu,China; 3.Key Laboratory of Western China's Mineral Resources and Geological Engineering of Ministry of Education,Chang'an University,Xi'an 710054,Shaanxi,China; 4.China Water Resources Beifang Investigation,Design and Research Co.,Ltd.,Tianjin 300222,China)
Keywords:
metro tunnel concealed excavation ground fissure model test ground settlement surrounding rock stress numerical simulation
PACS:
P642.13+1; U45
DOI:
10.19814/j.jese.2024.09008
Abstract:
Ground fissure is a special kind of urban geological disaster, which threatens the construction safety and long-term operation of Xi'an metro engineering. In order to reveal the disturbance effect of metro tunnel construction on surrounding rock in ground fissure site, Xi'an Metro Line 6 crossing the ground fissure zone was taken as the engineering background; through the physical model test with a geometric scale of 1:20, combined with numerical simulation, the response of surrounding rock in concealed excavation construction of metro tunnel in ground fissure site was studied. The results show that the ground settlement and the surrounding rock stress show an anti-“S” deformation law with the increase of excavation step size, which can be roughly divided into three stages, including small deformation, rapid deformation, and stable deformation; during the construction process, the peak values of ground settlement and surrounding rock stress both occur at the ground fissures, and the ground settlement and surrounding rock stress decrease with increasing distance from the ground fissures; the range affected by the ground fissures is 20.1 m in the hanging wall and 18.6 m in the footwall; the excavation direction determines the magnitude of stress and deformation in the surrounding rock, and the ground settlement and surrounding rock stress caused by the excavation from the footwall to the hanging wall of the ground fissure are slightly smaller than those caused by the excavation from the hanging wall to the footwall of the ground fissure; during the excavation process, the stress relaxation phenomenon of the surrounding rock of the tunnel appears at the ground fissure zone, the maximum increase of surrounding rock stress can reach 3.05 kPa(the corresponding prototype value is 61 kPa).

References:

[1] PENG J B,HUANG Q B,HU Z P,et al.A Proposed Solution to the Ground Fissure Encountered in Urban Metro Construction in Xi'an,China[J].Tunnelling and Underground Space Technology,2017,61:12-25.
[2] 黄强兵,彭建兵,王飞永,等.特殊地质城市地下空间开发利用面临的问题与挑战[J].地学前缘,2019,26(3):85-94.
HUANG Qiang-bing,PENG Jian-bing,WANG Fei-yong,et al.Issues and Challenges in the Development of Urban Underground Space in Adverse Geological Environment[J].Earth Science Frontiers,2019,26(3):85-94.
[3] 兰恒星,彭建兵,祝艳波,等.黄河流域地质地表过程与重大灾害效应研究与展望[J].中国科学:地球科学,2022,52(2):199-221.
LAN Heng-xing,PENG Jian-bing,ZHU Yan-bo,et al.Research on Geological and Surfacial Processes and Major Disaster Effects in the Yellow River Basin[J].Science China:Earth Sciences,2022,52(2):199-221.
[4] LAN H X,ZHANG T W,PENG J B,et al.Large Scale Land Reclamation and the Effects on Hydro-mechanical Behavior in Loess and Loess-derived Fill[J].Engineering Geology,2023,323:107241.
[5] TIAN N M,LAN H X,LI L P,et al.Human Activities Are Intensifying the Spatial Variation of Landslides in the Yellow River Basin[J].Science Bulletin,2025,70(2):263-272.
[6] 黄强兵,彭建兵,樊红卫,等.西安地裂缝对地铁隧道的危害及防治措施研究[J].岩土工程学报,2009,31(5):781-788.
HUANG Qiang-bing,PENG Jian-bing,FAN Hong-wei,et al.Metro Tunnel Hazards Induced by Active Ground Fissures in Xi'an and Relevant Control Measures[J].Chinese Journal of Geotechnical Engineering,2009,31(5):781-788.
[7] HUANG Q B,GOU Y X,XUE L M,et al.Model Test Study on the Mechanical Response of Metro Tunnel to Land Subsidence[J].Tunnelling and Underground Space Technology,2023,140:105333.
[8] 王 霆,刘维宁,张成满,等.地铁车站浅埋暗挖法施工引起地表沉降规律研究[J].岩石力学与工程学报,2007,26(9):1855-1861.
WANG Ting,LIU Wei-ning,ZHANG Cheng-man,et al.Study on Ground Settlement Induced by Shallow Metro Station Constructions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(9):1855-1861.
[9] 张冬梅,逄 健,任 辉,等.港珠澳大桥拱北隧道施工变形规律分析[J].岩土工程学报,2020,42(9):1632-1641.
ZHANG Dong-mei,PANG Jian,REN Hui,et al.Observed Deformation Behavior of Gongbei Tunnel of Hong Kong-Zhuhai-Macao Bridge During Construction[J].Chinese Journal of Geotechnical Engineering,2020,42(9):1632-1641.
[10] 来弘鹏,谢永利,刘 苗,等.黄土地区浅埋暗挖地铁隧道衬砌受力分析[J].岩土工程学报,2011,33(8):1167-1172.
LAI Hong-peng,XIE Yong-li,LIU Miao,et al.Mechanical Characteristics for Linings of Shallow Excavation Metro Tunnel in Loess Region[J].Chinese Journal of Geotechnical Engineering,2011,33(8):1167-1172.
[11] 刘泉声,彭星新,雷广峰,等.特大断面浅埋暗挖隧道十字岩柱开挖技术模型试验研究[J].岩土力学,2017,38(10):2780-2788.
LIU Quan-sheng,PENG Xing-xin,LEI Guang-feng,et al.Geomechanical Model Test on Excavation Technology of Supper-large Cross-section Ultra-shallow Tunnel with Cross Rock Pillar Method[J].Rock and Soil Mechanics,2017,38(10):2780-2788.
[12] 许文锋,张 峰,陈建平.大跨度黄土隧道CRD法优化研究[J].防灾减灾工程学报,2009,29(5):572-576.
XU Wen-feng,ZHANG Feng,CHEN Jian-ping.Optimization Study on CRD Method for a Large-span Loess Tunnel[J].Journal of Disaster Prevention and Mitigation Engineering,2009,29(5):572-576.
[13] WANG J X,CAO A S,WU Z,et al.Numerical Simulation on the Response of Adjacent Underground Pipelines to Super Shallow Buried Large Span Double-arch Tunnel Excavation[J].Applied Sciences,2022,12(2):621-621.
[14] FENG X F,YANG X,LI Y S,et al.Influence of Underground Tunnel Excavation on Upper-level Existing Pipelines[J].Advances in Civil Engineering,2022,2022:5469345.
[15] CAO P,WU M J,FANG L,et al.Numerical Modeling of the Strata Deformation During Tunnel Excavation Based on Discrete Element Method[J].IOP Conference Series:Materials Science and Engineering,2020,741:012008.
[16] REN Y W,ZHOU S J,JIA J Y,et al.The Influence of Construction Methods on the Stability of Tunnels and Ground Structures in the Construction of Urban Intersection Tunnels[J].Sustainability,2023,15(20):14720.
[17] 贺农农,李 攀,邵生俊,等.西安地铁隧道穿越饱和软黄土地段的地表沉降监测[J].地球科学与环境学报,2012,34(1):96-103.
HE Nong-nong,LI Pan,SHAO Sheng-jun,et al.Ground Settlement Monitoring Above Xi'an Metro Tunnel Through the Saturated Soft Loess[J].Journal of Earth Sciences and Environment,2012,34(1):96-103.
[18] 卢全中,李 聪,刘 聪,等.地裂缝分类及地面沉降区构造地裂缝防治对策[J].地球科学与环境学报,2021,43(2):366-375.
LU Quan-zhong,LI Cong,LIU Cong,et al.Classification of Ground Fissures and Prevention Measures of Tectonic Ground Fissures in Land Subsidence Area[J].Journal of Earth Sciences and Environment,2021,43(2):366-375.
[19] 黄强兵,彭 博,苟玉轩,等.西安地铁盾构隧道穿越地裂缝带的适应性与应对措施[J].地球科学与环境学报,2023,45(3):445-459.
HUANG Qiang-bing,PENG Bo,GOU Yu-xuan,et al.Study on the Adaptability and Countermeasures of Xi'an Metro Shield Tunnels Crossing Ground Fissure Zones[J].Journal of Earth Sciences and Environment,2023,45(3):445-459.
[20] 杨 招,黄强兵,肖双全,等.地裂缝场地地铁隧道施工CRD工法优化研究[J].工程地质学报,2021,29(2):516-525.
YANG Zhao,HUANG Qiang-bing,XIAO Shuang-quan,et al.Study on Optimization of CRD Construction Method for Metro Tunnel Through Ground Fissure Site[J].Journal of Engineering Geology,2021,29(2):516-525.
[21] HUANG Q B,GOU Y X,PENG B,et al.Model Test Study on the Deformation and Failure Mechanism of High-speed Railway Subgrade Obliquely Crossing Ground Fissure Zones[J].Transportation Geotechnics,2023,41:101010.
[22] HUANG Q B,MIAO C Y,YUAN Y,et al.Failure Analysis of Metro Tunnel Induced by Land Subsidence in Xi'an,China[J].Engineering Failure Analysis,2023,145:106996.
[23] 杨 兆,黄强兵,王立新,等.西安地裂缝场地地铁隧道盾构法施工沉降分析[J].铁道标准设计,2021,65(2):95-103.
YANG Zhao,HUANG Qiang-bing,WANG Li-xin,et al.Analysis on the Construction Settlement of Metro Tunnel by Shield Method in Xi'an Ground Fissure Site[J].Railway Standard Design,2021,65(2):95-103.
[24] LI C Y,HUANG Q B,GOU Y X,et al.Deformation and Failure Analysis of Metro Shield Tunnel Induced by Active Ground Fissure in Xi'an,China[J].Engineering Failure Analysis,2022,142:106776.
[25] YAN Y F,HUANG Q B,XIE Y L,et al.Failure Analysis and Deformation Mechanism of Segmented Utility Tunnels Crossing Ground Fissure Zones with Diffe-rent Intersection Angles[J].Engineering Failure Ana-lysis,2022,139:106456.
[26] 苟玉轩,黄强兵,杨晓强,等.大角度斜交地裂缝带盾构隧道变形破坏机制的模型试验研究[J].土木工程学报,2022,55(10):117-130.
GOU Yu-xuan,HUANG Qiang-bing,YANG Xiao-qiang,et al.Model Test on Deformation and Failure Mechanism of Shield Tunnel Intersecting Ground Fissure with Large Angle[J].China Civil Engineering Journal,2022,55(10):117-130.
[27] 黄强兵,姜紫看,邓亚虹,等.穿越地裂缝带地铁隧道结构分段长度优化研究[J].水文地质工程地质,2019,46(2):109-117.
HUANG Qiang-bing,JIANG Zi-kan,DENG Ya-hong,et al.Optimal Length for Segmented Structure of the Metro Tunnel Obliquely Crossing Active Ground Fissure Zone[J].Hydrogeology & Engineering Geology,2019,46(2):109-117.
[28] 范 文,熊 炜,彭建兵,等.分段式地铁隧道穿越地裂缝带的模型试验研究[J].岩土工程学报,2010,32(1):138-143.
FAN Wen,XIONG Wei,PENG Jian-bing,et al.Model Tests on Segmental Subway Tunnel Crossing Ground Fissure Belt[J].Chinese Journal of Geotechnical Engineering,2010,32(1):138-143.
[29] 张树仁.黄土地层穿地裂缝段暗挖地铁隧道施工力学行为研究[D].西安:长安大学,2018.
ZHANG Shu-ren.Research on Construction Mecha-nics Behavior of the Shallow Excavation in the Loess Subway Tunnel Crossing Ground Fissures[D].Xi'an:Chang'an University,2018.
[30] 徐明祥,黄强兵,王庆兵,等.西安地裂缝地段浅埋暗挖地铁隧道施工沉降规律[J].水文地质工程地质,2020,47(1):161-170.
XU Ming-xiang,HUANG Qiang-bing,WANG Qing-bing,et al.Settlement Rules of Shallow-buried Metro Tunnel Construction in the Xi'an Ground Fissure Section[J].Hydrogeology & Engineering Geology,2020,47(1):161-170.
[31] 曹 原,黄强兵,康孝森,等.地裂缝场地隧道暗挖地表沉降影响因素分析[J].科学技术与工程,2022,22(6):2226-2236.
CAO Yuan,HUANG Qiang-bing,KANG Xiao-sen,et al.Analysis on Influencing Factors of Ground Settlement in Ground Fissure Site Induced by Tunnel Underground Excavation[J].Science Technology and Engineering,2022,22(6):2226-2236.
[32] 杨 招.地裂缝场地地铁隧道暗挖施工沉降及工法优化研究[D].西安:长安大学,2021.
YANG Zhao.Study on the Ground Settlement and Method Optimization for Shallow Buried Metro Tunnel in Ground Fissure Site[D].Xi'an:Chang'an University,2021.
[33] DBJ 61/T 182—2021,西安地裂缝场地勘察与工程设计规程[S].
DBJ 61/T 182—2021,Specification for Site Investigation and Engineering Design on Xi'an Ground Fractures[S].
[34] GOU Y X,HUANG Q B,KANG X S,et al.Experimental Study on the Mechanical Response of Metro Shield Tunnels Obliquely Crossing Ground Fissures[J].Tunnelling and Underground Space Technology,2023,132:104849.
[35] 孟振江,彭建兵,黄强兵,等.基于断裂错动引起地铁隧道的变形响应研究[J].工程地质学报,2017,25(6):1624-1632.
MENG Zhen-jiang,PENG Jian-bing,HUANG Qiang-bing,et al.Study on Deformation Response of Metro Tunnel Based on Fracture Dislocation[J].Journal of Engineering Geology,2017,25(6):1624-1632.
[36] 王庆兵,黄强兵,闫钰丰,等.地裂缝场地施工降水对地表沉降和地层应力的影响研究[J].地质力学学报,2020,26(2):221-231.
WANG Qing-bing,HUANG Qiang-bing,YAN Yu-feng,et al.Study on Influence of Construction Preci-pitation on Surface Settlement and Stratum Stress on the Ground Fissure Site[J].Journal of Geomechanics,2020,26(2):221-231.
[37] 黄强兵,刘妮娜,闫钰丰,等.暗挖隧道穿越地裂缝的综合施工技术研究[R].北京:北京市政路桥股份有限公司,2021.
HUANG Qiang-bing,LIU Ni-na,YAN Yu-feng,et al,Study on Comprehensive Construction Technology of Underground Tunnel Crossing Ground Fissure[R].Beijing:Beijing Municipal Engineering and Road & Bridge Co.,Ltd.,2021.