|本期目录/Table of Contents|

[1]贺农农,李攀,邵生俊,等.西安地铁隧道穿越饱和软黄土地段的地表沉降监测[J].地球科学与环境学报,2012,34(01):96-103.
 HE Nong-nong,LI Pan,SHAO Sheng-jun,et al.Ground settlement monitoring above Xi'an Metro tunnel through the saturated soft loess[J].Journal of Earth Sciences and Environment,2012,34(01):96-103.
点击复制

西安地铁隧道穿越饱和软黄土地段的地表沉降监测(PDF)
分享到:

《地球科学与环境学报》[ISSN:1672-6561/CN:61-1423/P]

卷:
第34卷
期数:
2012年第01期
页码:
96-103
栏目:
地质工程
出版日期:
2012-03-20

文章信息/Info

Title:
Ground settlement monitoring above Xi'an Metro tunnel through the saturated soft loess
作者:
贺农农1李攀2邵生俊2李佳坤2焦阳阳2
1.西安市地下铁道有限责任公司,陕西 西安 710018; 2.西安理工大学 土木建筑工程学院,陕西 西安 710048
Author(s):
HE Nong-nong1 LI Pan2 SHAO Sheng-jun2 LI Jia-kun2 JIAO Yang-yang2
1. Xi'an Metro Co. Ltd., Xi'an 710018, Shaanxi, China; 2. School of Civil Engineering and Architecture, Xi'an University of Technology, Xi'an 710048, Shaanxi, China
关键词:
地质工程 隧道 西安地铁 沉降监测 沉降槽宽度 地层损失率 饱和软黄土
Keywords:
geological engineering tunnel Xi'an Metro settlement monitoring width of settling vessel loss ratio of stratum saturated soft loess
分类号:
P642.13+1; TU94
DOI:
-
文献标志码:
A
摘要:
以西安地铁一号线朝阳门站—康复路站区段饱和软黄土地铁隧道为研究对象,通过施工期现场地表沉降变形监测,分析了在饱和软黄土特殊地层条件下隧道浅埋暗挖法施工引起的该区段地表沉降变形规律以及地表沉降槽分布特征。结果表明:在饱和软黄土隧道开挖时,随着掌子面的推进,隧道顶地表沉降可分为沉降微小阶段、沉降显著发展阶段、沉降缓慢阶段和沉降稳定阶段; 单线隧道开挖后的最大地表沉降量为18.89 mm,双线隧道开挖后的最大地表沉降量为36.4 mm; 已开挖隧道对围岩土体的扰动作用使得后开挖隧道的地表沉降发展较大; 双线隧道的地表沉降槽宽度接近单线隧道沉降槽宽度的2倍,因此可以将其近似为单线隧道地表沉降槽宽度与双线隧道轴线中点距离之和; 单线隧道开挖后地表沉降槽宽度为8.4~9.3 m,双线隧道开挖后地表沉降槽宽度为16.2~17.5 m; 隧道开挖施工的沉降槽宽度参数为0.435~0.467,单线隧道开挖后的地层损失率为0.765%~1.324%,双线隧道开挖后的地层损失率为1.231%~2.200%。
Abstract:
The tunnel through the saturated soft loess from Chaoyangmen Station to Kangfulu Station in Line 1 of Xi'an Metro was taken as example; based on the local ground settlement deformation monitoring during the construction, the discipline of ground settlement deformation caused by the tunnel construction with shallow tunneling method under the special condition of saturated soft loess and the distribution of settling vessel were analyzed. The results showed that the ground settlement above the tunnel could be divided into little settlement, significant fast settlement, slow settlement and stable settlement stages when the excavation face went forward continuously, and the tunnel with saturated soft loess was excavated; the maximum settlement was 18.89 mm after single tunnel excavated and 36.4 mm after double tunnels excavated; the ground settlement of tunnel excavated secondly was large because of the disturbance of the tunnel excavated firstly to wall rock; the width of ground settling vessel of double tunnels was approximately twice of single tunnel, so the width of ground settling vessel of double tunnels approximated the sum of the width of ground settling vessel of single tunnel and the distance of axes midpoints between the double tunnels; the widths of ground settling vessel were 8.4-9.3 m after single tunnel excavated and 16.2-17.5 m after double tunnels excavated; the parameters of width of ground settling vessel were 0.435-0.467 after tunnel excavated, loss ratios of stratum were 0.765%-1.324% after single tunnel excavated and 1.231%-2.200% after double tunnels excavated.

参考文献/References:

[1] 王 霆,刘维宁,张成满,等.地铁车站浅埋暗挖法施工引起地表沉降规律研究[J].岩石力学与工程学报,2007,26(9):1855-1861. WANG Ting,LIU Wei-ning,ZHANG Cheng-man,et al.Study on ground settlement induced by shallow metro station constructions[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(9):1855-1861.(in Chinese)
[2] 王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004. WANG Meng-shu.General theory of shallow underground excavation technology for underground construction[M].Hefei:Anhui Education Press,2004.(in Chinese)
[3] 施成华.城市隧道施工地层变形时空统一预测理论及应用研究[D].长沙:中南大学,2007. SHI Cheng-hua.Research on time-space united calculation theory of stratum deformation for urban tunnel excavation and its application[D].Changsha:Central South University,2007.(in Chinese)
[4] 姚宣德,王梦恕.地铁浅埋暗挖法施工引起的地表沉降控制标准的统计分析[J].岩石力学与工程学报,2006,25(10):2030-2035. YAO Xuan-de,WANG Meng-shu.Statistic analysis of guideposts for ground settlement induced by shallow tunnel construction[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(10):2030-2035.(in Chinese)
[5] 齐震明,李鹏飞.地铁区间浅埋暗挖隧道地表沉降的控制标准[J].北京交通大学学报,2010,34(3):117-121. QI Zhen-ming,LI Peng-fei.Control standard of ground surface settlements in metro section shallow tunnel[J].Journal of Beijing Jiaotong University,2010,34(3):117-121.(in Chinese)
[6] 吴 波,高 波,索晓明,等.城市地铁小间距隧道施工性态的力学模拟与分析[J].中国公路学报,2005,18(3):84-89. WU Bo,GAO Bo,SUO Xiao-ming,et al.Mechanical simulation and analysis of construction behavior of urban metro tunnelling with small interval[J].China Journal of Highway and Transport,2005,18(3):84-89.(in Chinese)
[7] 胡志平,彭建兵,黄强兵,等.地铁盾构隧道30°斜穿地裂缝的物理模拟试验[J].长安大学学报:自然科学版,2009,29(4):63-68. HU Zhi-ping,PENG Jian-bing,HUANG Qiang-bing,et al.Physical modeling test on shield tunnel crossing ground fissure with 30°[J].Journal of Chang'an University:Natural Science Edition,2009,29(4):63-68.(in Chinese)
[8] 朱洪高,郑宜枫,陈 昊.双圆盾构隧道土体地表沉降特性[J].建筑科学与工程学报,2006,23(2):62-67. ZHU Hong-gao,ZHENG Yi-feng,CHEN Hao.Characteristics of soil surface settlement for double-O-tube shield tunnel[J].Journal of Architecture and Civil Engineering,2006,23(2):62-67.(in Chinese)
[9] 杨更社,吴成发,李瑞强.西安地铁1号线区间特殊地段施工风险评估[J].西安科技大学学报,2010,30(2):159-164. YANG Geng-she,WU Cheng-fa,LI Rui-qiang.Risk assessment of Xi'an Metro Line 1 special sections construction[J].Journal of Xi'an University of Science and Technology,2010,30(2):159-164.(in Chinese)
[10] 门玉明,张结红,刘洪佳,等.西安地铁隧道穿越地裂缝带的计算模型探讨[J].地球科学与环境学报,2011,33(1):95-100. MEN Yu-ming,ZHANG Jie-hong,LIU Hong-jia,et al.Discussion on the computing model for Xi'an Metro tunnel passing through the ground fissure zone[J].Journal of Earth Sciences and Environment,2011,33(1):95-100.(in Chinese)
[11] PECK R B.Deep excavations and tunneling in soft ground[C]∥Committee of 7th International Conference on Soil Mechanics and Foundation Engineering.Proceedings of 7th International Conference on Soil Mechanics and Foundation Engineering.Mexico City:Committee of 7th International Conference on Soil Mechanics and Foundation Engineering,1969:225-290.
[12] O'REILLY M P,NEW B M.Settlements above tunnels in the United Kingdom:their magnitude and prediction[C]∥JONES M J.Tunnelling 82:Papers Presented at the Third International Symposium.London:Institution of Mining and Meta-llurgy,1982:173-181.
[13] ATTEWELL P B,WOODMAN J P.Predicting the dynamics of ground settlement and its derivatives caused by tunneling in soil[J].Ground Engineering,1982,15(8):13-20.
[14] ATTEWELL P B,SELBY A R.Tunneling in compressible soils:large ground movements and structural implications[J].Tunneling and Underground Space Technology,1989,4(4):481-487.
[15] MAIR R J,TAYLOR R N,BRACEGIRDLE A.Subsurface settlement profiles above tunnels in clays[J].Geotechnique,1993,43(2):315-320.
[16] MAIR R J,TAYLOR R N,BURLAND J B.Prediction of ground movements and assessment of risk of building damage due to bored tunneling[C]∥MAIR R J,TAYLOR R N.Symposium on Geotechnical Aspects of Underground Construc-tion in Soft Ground.London:Balkema,1996:713-718.
[17] 韩 煊,李 宁,STANDING J R.Peck公式在我国隧道施工地面变形预测中的适用性分析[J].岩土力学,2007,28(1):23-28,35. HAN Xuan,LI Ning,STANDING J R.An adaptability study of Peck Equation applied to predicting ground settlements induced by tunneling in China[J].Rock and Soil Mechanics,2007,28(1):23-28,35.(in Chinese)
[18] 郑怀洲.北京地铁东四站地表沉降监测数据分析[J].铁道标准设计,2006(4):60-62. ZHENG Huai-zhou.Analysis on the ground settlement monitoring in Dongsi Station of Beijing Subway[J].Railway Standard Design,2006(4):60-62.(in Chinese)
[19] 姜忻良,赵志民,李 园.隧道开挖引起土层沉降槽曲线形态的分析与计算[J].岩土力学,2004,25(10):1542-1544. JIANG Xin-liang,ZHAO Zhi-min,LI Yuan.Analysis and calculation of surface and subsurface settlement trough profiles due to tunneling[J].Rock and Soil Mechanics,2004,25(10):1542-1544.(in Chinese)
[20] 缪林昌,王 非,吕伟华.城市地铁隧道施工引起的地面沉降[J].东南大学学报:自然科学版,2008,38(2):293-297. MIAO Lin-chang,WANG Fei,LU Wei-hua.Ground surface settlement due to urban tunnel construction[J].Journal of Southeast University:Natural Science Edition,2008,38(2):293-297.(in Chinese)
[21] 关继发.北京地铁5号线暗挖区间地表沉降分析及控制[J].现代城市轨道交通,2008(4):31-33. GUAN Ji-fa.Analysis and suggestion on control of ground surface settlement induced by boring running tunnels of Beijing Metro Line 5[J].Modern Urban Transit,2008(4):31-33.(in Chinese)
[22] 施成华.隧道开挖及疏水引起的地表沉降与变形[J].中国公路学报,2007,20(1):91-95. SHI Cheng-hua.Ground surface settlement and deformation caused by tunnel excavation and dewatering[J].China Journal of Highway and Transport,2007,20(1):91-95.(in Chinese)
[23] 杨晓华,李新伟,俞永华.土工格室加固浅层饱和黄土地基的有限元分析[J].中国公路学报,2005,18(2):12-17. YANG Xiao-hua,LI Xin-wei,YU Yong-hua.Finite element analysis of shallow saturated loess reinforced with geocell[J].China Journal of Highway and Transport,2005,18(2):12-17.(in Chinese)
[24] 彭小云,叶万军,折学森,等.黄土沟壑区湿软路基沉降预测模型[J].交通运输工程学报,2007,7(2):70-75. PENG Xiao-yun,YE Wan-jun,SHE Xue-sen,et al.Settlement prediction model of wettest-soft loess subgrade in ravine regions[J].Journal of Traffic and Transportation Engineering,2007,7(2):70-75.(in Chinese)
[25] 王梦恕,张成平.城市地下工程建设的事故分析及控制对策[J].建筑科学与工程学报,2008,25(2):1-6. WANG Meng-shu,ZHANG Cheng-ping.Analysis of accident induced by urban underground project construction and its control measures[J].Journal of Architecture and Civil En-gineering,2008,25(2):1-6.(in Chinese)
[26] 任建喜,张引合,高丙丽,等.浅埋暗挖地铁隧道施工方案FLAC优化分析[J].西安科技大学学报,2011,31(2):157-162. REN Jian-xi,ZHANG Yin-he,GAO Bing-li,et al.Optimization analysis on subway tunnel construction plan by shallow dark excavation method with FLAC[J].Journal of Xi'an University of Science and Technology,2011,31(2):157-162.(in Chinese)

相似文献/References:

[1]刘瑾,张达,汪勇,等.高分子稳定剂生态护坡机理及其应用[J].地球科学与环境学报,2016,38(03):420.
 LIU Jin,ZHANG Da,WANG Yong,et al.Reinforcement Mechanism of Soil Slope Surface with Polymer Soil Stabilizer and Its Application[J].Journal of Earth Sciences and Environment,2016,38(01):420.
[2]刘瑾,亓孝辉,张达,等.聚氨酯型固化剂改良表层砂土抗渗透特性试验[J].地球科学与环境学报,2017,39(01):126.
 LIU Jin,QI Xiao-hui,ZHANG Da,et al.Experiment on Penetration Resistance of Surface Sandy Soil Stabilized by Polyurethane Soil Stabilizers[J].Journal of Earth Sciences and Environment,2017,39(01):126.
[3]张文波,朱光明,马德堂,等.井间地震初至波分析[J].地球科学与环境学报,2006,28(01):70.
 ZHANG Wen-bo,ZHU G uang-ming,MA De-tang,et al.Analysis to First Breaks in Cross Hole Seismic Waves[J].Journal of Earth Sciences and Environment,2006,28(01):70.
[4]刘瑾,冯巧,孙少锐,等.聚氨酯型固化剂加固砂性土抗压试验及破坏模式[J].地球科学与环境学报,2017,39(05):704.
 LIU Jin,FENG Qiao,SUN Shao-rui,et al.Unconfined Compression Test and Failure Mode of Sandy Soil Stabilized by Polyurethane Soil Stabilizer[J].Journal of Earth Sciences and Environment,2017,39(01):704.
[5]曹剑秋,张巍,肖瑞,等.南京粉砂三轴压缩过程中的三维孔隙结构演化特征[J].地球科学与环境学报,2018,40(04):487.
 CAO Jian-qiu,ZHANG Wei,XIAO Rui,et al.Characteristics of 3D Pore Structure Evolution of Nanjing Silty Sand During the Triaxial Compression[J].Journal of Earth Sciences and Environment,2018,40(01):487.
[6]戚志宇,李志清*.黄土蠕变特性研究进展[J].地球科学与环境学报,2023,45(03):485.[doi:10.19814/j.jese.2022.10028]
 QI Zhi-yu,LI Zhi-qing*.Review on Creep Properties of Loess[J].Journal of Earth Sciences and Environment,2023,45(01):485.[doi:10.19814/j.jese.2022.10028]

备注/Memo

备注/Memo:
收稿日期:2011-04-15
基金项目:国家自然科学基金项目(10872161); 西安市地下铁道有限责任公司项目(D1-YJ-012010058); 陕西省黄土力学与工程重点实验室开放基金项目(220909)
作者简介:贺农农(1956-),男,陕西富平人,高级工程师,工学硕士,从事地铁建设与管理研究,E-mail:346716336@qq.com。