-
[1]陈新建,孙琳,李新星,等.隧道工程地质评价的内容和方法[J].地球科学与环境学报,2004,26(01):41.
CHEN Xin-jian,SUN Lin,LI Xin-xing,et al.Contents and methods of the tunnel engineering geology evaluation[J].Journal of Earth Sciences and Environment,2004,26(04):41.
[2]邓兆宁,常洲,鲁志方,等.穿越富水断层时红层泥岩隧道的受力响应[J].地球科学与环境学报,2024,46(03):414.[doi:10.19814/j.jese.2023.12056]
DENG Zhao-ning,CHANG Zhou,LU Zhi-fang,et al.Stress Response of Red Mudstone Tunnel Crossing Water-rich Fault[J].Journal of Earth Sciences and Environment,2024,46(04):414.[doi:10.19814/j.jese.2023.12056]
[3]张建*.基于蜣螂优化算法-双向长短时记忆网络的隧道软弱围岩变形预测[J].地球科学与环境学报,2025,47(04):634.[doi:10.19814/j.jese.2024.12051]
ZHANG Jian*.Deformation Prediction of Weak Surrounding Rock of the Tunnel Based on DBO-BiLSTM[J].Journal of Earth Sciences and Environment,2025,47(04):634.[doi:10.19814/j.jese.2024.12051]